In the dynamic world of construction projects, changes to plans can happen at any time. For our mobile CLINER wash bay, however, these are not an obstacle, but an opportunity to demonstrate our strengths.

On a recent project, our customer was faced with this exact situation. An unexpected change in the construction plan meant that the site originally planned for our system was no longer available. Thanks to the mobility and flexibility of the CLINER wash bay system, however, our customer was able to respond to the new situation quickly and efficiently.

Wash Bay Transport

The challenge lay in reaching the new, geometrically demanding location. This called for the expertise of FK Logistik, who arrived on site with an electric telehandler. With this impressive machine capable of lifting loads of up to 16 metric tons, the system was moved to its new location with ease.

After precise positioning in the hall door, the CLINER wash bay was moved to its final location on heavy-duty transport dollies and safely lowered using hydraulic pumps.

Fast Commissioning of the Wash Bay

Fast commissioning within an hour demonstrates how thoroughly prepared our system is—every CLINER wash bay is fully pre-assembled and tested at the factory.

Relocating at a later date is also effortless with the CLINER wash bay and can be completed in just half a day. The rotating windows and turntables ensure safe operation and help reduce internal logistics times.

This project once again demonstrated that the CLINER wash bay from INORON is the ideal solution for anyone who does not shy away from plan changes and values flexibility and efficiency.